Feasibility Study

Ni Project, Western Australia

Piran Mining was commissioned to undertake a Feasibility Study for an Underground Nickel Project. The focus of the study was primarily within four key areas Hydro-geology, Metallurgy, Geotechnical and Mining Method.

IMG_0436.JPG

Feasibility Study

Ni Project, Western Australia

Piran Mining was engaged to undertake a Feasibility Study for an Open Pit Nickel Project.

trout

Mining Concept Study

Au Project, Western Australia

Piran Mining was engaged to undertake an underground mining scoping study below the existing open pit of a deposit located in Western Australia. Following a review with the client a new larger proposed final pit design was provided and the underground mining opportunity was re-evaluated against a smaller underground resource.

osborne

Mine Ventilation Review

Cu Project, Queensland, Australia.

Piran Mining was engaged to undertake a ventilation review of a copper mine in North Queensland.

Diggers

Pre Feasibility Study

Ni Project, Western Australia

Piran Mining was engaged to provide a PFS for development on an underground nickel deposit in Western Australia.

Mining Concept Study

IMG_5990.JPG

Au Project, Western Australia

Piran Mining was engaged to undertake a conceptual underground mine design and schedule for a deposit, approximately 100km south of Laverton in Western Australia. The client intended to extend an existing open pit that was mined until 2004. The study reviewed the potential for an underground operation below the planned pit extension. The mine design focused on the higher grade zones of the deposit which were previously indentified by earlier work undertaken by Piran Mining. A final draft report and detailed mine design was created in Mine 2-4D software as part of this study.

fatal.JPG

Fatal Flaw Study, for SLC

Zn Project, Queensland, Australia

6

Desktop Mine Evaluation

Ni Project, Western Australia

Piran Mining was commissioned to conduct a desktop open pit mine evaluation on several deposits. The purpose of the study was to determine whether the deposits could be mined and the product sold economically using conventional open pit mining methods and the clients nickel treatment process.

IMG_6007.JPG

Main Underground Haulage Level Design & Operating Philosophy Assessment

Au Project, D.R.C

Piran Mining was engaged to clearly present an updated assessment of the main haulage level requirements and justify the preferred haulage system to be installed and operated on the main haulage level.

2

Evaluation of Tenders for the Development and Production of a Underground Project

D.R.C

Piran Mining was engaged to undertake the underground mining tender process which included; defining the scope of works; creating a Request for Tender document for a five-year mining contract; arranging visits for interested parties to the client's project site; dealing with contractor clarifications and ultimately evaluation of the recieved tenders.​

P2170880.JPG

Mine Engineering Site Technical Support

Au Project, PNG

Piran Mining was engaged to provide technical support to the site. The objective was to provide pragmatic on site support to the mining technical team relating to ventilation, mining method assessment and mine design.

canada.JPG

Pre Feasibility Study

Poly-Metallic Project, Manitoba, Canada

Piran Mining was engaged to provide independent advice to client on PFS for development of an open pit poly-metallic deposit.

finland.JPG

Redesign of Underground Project

Cu-Au Project, Finland

Piran Mining was engaged to undertake a redesign of a Underground Project. The objective of the re design work was to focus on providing a higher grade (%Cu) ore stream, reduced production output, less waste development and define an alternative lower cost backfill philosophy, i.e. from hydraulic fill to cemented rock fill (CFR)

2014-09-29 16.50.09.jpg

Preliminary Mining Assessment

Au Project, Mali

Piran Mining was commissioned by the client to undertake a Pre-Feasibility Study (PFS) on a project, located in Mali, West Africa. As part of the preliminary analysis for the PFS an underground mining assessment was conducted. The purpose of undertaking this work was to provide guidance on the appropriate mining method on which the underground operation could be costed and hence designed.

IMG_6446.JPG

Bulyanhulu

Au Project, Tanzania

Piran Mining was Engaged to undertake a Feasibility Study for the Underground Gold Mine

9

Poly-Metallic Underground Deposit

South Western Europe

Piran Mining UK was engaged to aid in technical matters.

Work currently in progress.

brazil_edited.jpg

Mining Method Assessment

Ni Project, Brazil

Piran mining was engaged to undertake an underground mining evaluation of a large low grade project, located in Brazil.

4

Goldrush

Nevada, U.S.A

Piran Mining UK has completed work including a Feasibility Study and Contract Management work.

due.JPG

Due Dilligence

West Africa

A due diligence was conducted on behalf of an international client on an existing large scale / long life underground Au mine.  The due diligence covered all mining and geotechnical aspects.  Site visits were conducted to ensure seamless interaction and collaboration with the onsite owners team.  This work ultimately identified that a level of contradiction existed within the available technical data.   Further work was therefore completed to improve the understanding of these components.  The due diligence ultimately identified areas where a different mining approach could be realistically undertaken.   As such a new mine plan and schedule was completed for certain areas of the mine and the whole project was recosted and economically assessed.  

IMG_0183.JPG

Shaft Sink Tender & Evaluation

D.R.C

Piran Mining provided remote and onsite support relating to the tendering and evaluation process of a 8m dia. blind shaft sink in the DRC. 

This included site visits to various shaft sinking operations in Africa, the detailed assessment of tenders and holding clarification meetings.  Piran was also engaged to manage the change management relating to shaft design modifications to enable a more efficient shaft hoist system.  The whole process from initial EOI to award was completed in record time compared to other comparable shaft sink contracts. 

IMG_7109_edited.jpg

Fluorspar Project

Newfoundland, Canada

Piran UK was engaged to undertake a due diligence (DD) on a fluorspar (critical mineral) project located in remote Newfoundland.  This was conducted in winter during challenging conditions. Due to external demands this had to be completed in a short as time as possible.  The project contained both multiple open pit and underground prospects as well as a marine export facility.  Open pit mining operations had ceased in early 2022 when the previous owners sought creditor protection.   As a result of the DD a successful bid was made by the client. 

 

Piran UK was subsequently retained to provide both onsite and remote technical assistance prior to the operation gaining a new owners team.  This included sourcing updated resource models for the priority deposits and managing the mining tender process.

 

Once operational this project will be the only Fluorspar producer in Canada and N. America.   